Seasons & episodes
S35 · E1Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore 2013-10-05
For the first time, This Old House takes on three homes at the same time. The team meets the homeowners and discusses rebuilding stronger, smarter, and safer.
S35 · E2Jersey Shore Rebuilds 2013 Part 2: Drastic Measures 2013-10-12
The team discusses how FEMA impacts building requirements, and foundation options. The Manasquan home is razed. Kevin takes a tour of Bay Head. Trouble begins at Point Pleasant.
S35 · E3Jersey Shore Rebuilds 2013 Part 3: Getting to Work 2013-10-19
The Mantoloking home is examined from a new angle while the Bay Head house begins framing. The team learns about a innovative foundation to be used on the Point Pleasant home. And the shows visits a business in Bay Head that has already successfully rebuilt.
S35 · E4Jersey Shore Rebuilds 2013 Part 4: Built for Speed 2013-10-26
The show visits the boardwalk at Seaside Heights to view reconstruction. The Bay Head home has a new deck installed. The Point Pleasant project gets crushed! A visit to the factory that will make the Manasquan house in only one week.
S35 · E5Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand 2013-11-02
The windows are installed at the Bay Head house. At Point Pleasant a new dinning room is installed in place of the garage. And the modular home arrives on site in Manasquan.
S35 · E6Jersey Shore Rebuilds 2013 Part 6: Go With the Flow 2013-11-09
Breakaway walls and flood vents are installed at the Point Pleasant. The work on the modular home continues. What plants and trees survived Sandy?
S35 · E7Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level 2013-11-16
Footings are added in Bay Head home. Point Pleasant gets stone veneer, fiber-cement siding and composite decking. Manasquan project is finished. Pro surfer Sam Hammer visits the show. And marine biologist Chris Wojcik talks about the bay.
S35 · E8Jersey Shore Rebuilds 2013 Part 8: One Year Later 2013-11-23
A tour of the Mantoloking project. And the wrap party for the Jersey Shore projects.
S35 · E9Arlington 2014: Part 1: A New Project 2014-01-02
The crew begins work on Italianate-style home originally dating to 1872.
S35 · E10Arlington 2014: Part 2: Old House Discoveries 2014-01-09
Richard visits a water tank that has been disguised as a Greek temple. During demolition, the crew finds traces of the past. Roger moves a rhododendron .
S35 · E11Arlington 2014: Part 3: Concrete Jungle 2014-01-16
Kevin, Norm, Tom, and mason Mark McCullough replace the substandard foundation by pouring a new slab and curb, all while preserving the antique fieldstone foundation. The crew also finds headroom and original plaster details in the living room.
S35 · E12Arlington 2014: Part 4: Quest for a Dry Basement 2014-01-23
Tom joins the home's new roof to the existing. Architect David The architect explains how much change an 200 additional square feet the house. The existing fieldstone foundation gets additional repairs and waterproofing. Roger tours a nearby Garden. Norm and Tom repair the front door.
S35 · E13Arlington 2014: Part 5: Getting to Level 2014-02-01
Leveling the ceiling in the kitchen and the floor in the finished basement is explained. An opening for a new window is cut. Landscape architect Cricket Beauregard explains what to do with a shady front yard.
S35 · E14Arlington 2014: Part 6: Additional Details 2014-02-08
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
S35 · E15Arlington 2014: Part 7: Arlington Heights 2014-02-15
Selective tree pruning occurs in the yard. Inside, Richard explains the choice between PEX and copper for water supply lines. Kevin tours an 1872 Stick Style home.
S35 · E16Arlington 2014: Part 8: Italianate Inspiration 2014-02-22
Exterior colors are proposed. A tour of a nearby 1870 Italianate style home. Richard shows a more attractive approach to PVC vents. Tom shows his favorite applications for radiant heat.
S35 · E17Arlington 2014: Part 9: Deadliest Old House? 2014-03-01
A "Deadliest Catch" star drops by to help with plaster cracks. Making the second floor railing safer.
S35 · E18Arlington 2014: Part 10: Old World New World 2014-03-08
Installing steps with ice. More plaster repairs. The use of 3D-printing for home repair. Review of the front porch design.
S35 · E19Arlington 2014: Part 11: House vs. Nature 2014-03-15
A hydrangea that is damaging the foundation is removed. Painting with red paint. How to keep the basement dry.
S35 · E20Arlington 2014: Part 12: Water Water Everywhere 2014-03-22
A visit to Spy Pond in Massachusetts. A new water main is installed. Chestnut flooring is selected. Fiberglass gutters that appear appropriate to the historical period are installed.
S35 · E21Arlington 2014: Part 13: Brick, Trim and Tile 2014-03-29
A sidewalk is prepared. Custom moldings are installed. Tiles are picked by the homeowner. New doors and countertops are installed.
S35 · E22Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame 2014-04-05
Adding the final edge detail to soapstone countertops; cutting down 12-inch marble tiles for wainscoting; oval mirror frame; oak stair treads; darkening soapstone countertops with carnauba wax and walnut oil.
S35 · E23Arlington 2014: Part 15: Made in the Shade 2014-04-12
Installing a custom PVC fence and arbor; creating a marble herringbone pattern in the powder room; grout options for the faux slate floor in the mudroom; building a sliding barn door; alternatives to the usual shade plants.
S35 · E24Arlington 2014: Part 16: Decorative Details 2014-04-19
A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.